On Matt's frame, I was able to get it all tacked up in the jig, check the alignment, and then get it all weld it up. That is one big head tube, but I don't think it looks too out of place with the size of the down tube and top tube on this frame.
This weekend we plan to lock in the upper pivot, add the bottom shock mount, add the curved seat tube support, and braze on all the braze ons including the ISCG plate.
Looks fantastic. Thanks Clark and Momo.
ReplyDelete-M